Bismayah Gas Power Plant Project - Phase 1 Enka
Turkish company Enka contracted with MAS Holding Company for Energy and Electricity for the construction of Bismayah Gas Power Plant - Phase I belonging to the Iraqi Ministry of Electricity.
The contract was executed from 2015 to 2016, then the contract was renewed for several consecutive times as follows:
- First replenishment: 2016 to 2017
- Second replenishment: 2017 to 2018
- Third replenishment: 2018 to 2019
Processing materials:
- Frozen items (all meat) - Fresh meat (calf and sheep) - Dairy products - Bread (4000 loaves per day) - Dry and canned items - Fruits and vegetables of all kinds - Sterilized drinking water of 20 liters - Sterilized drinking water of 500 ml - Cleaning materials and chemicals - Disposable items - Soft drinks - Establishing a mini-market inside the work site that works 12 hours a day